1. Installation of Wi-Fi on ships
  2. 1 German shipowner Reederei Thomas Schulte has signed a contract for the installation of Wi-Fi on 40 of its ships - bulk carriers and container ships. The system provides e-mail and SMS service for crew....
  3. MSC announce GRI from India/Pakistan and Persian Gulf to East Africa
  4. 2 MSC Mediterranean Shipping Company advise clients that it will implement a General Rate Increase (GRI) for all cargo to be shipped from Nhava Sheva, Mundra, Jebel Ali and the Persian Gulf to Dar es Sa....
  5. MSC announce GRI for cargo from the U.S.A. to the Far East
  6. 3 MSC Mediterranean Shipping Company advise clients that it will implement a General Rate Increase (GRI) for all cargo to be shipped from the U.S.A. to the Far East destinations as of March 01, 2012 B/L....
  7. World Alliance to Launch New Trans-Atlantic Service
  8. 4 The New World Alliance (TNWA) – APL Co. Pte Ltd (APL), Hyundai Merchant Marine (HMM) and Mitsui OSK Lines (MOL) today announced the launch of a new Trans-Atlantic service connecting Europe and ....
  9. Maersk announce Service changes
  10. 5 Northern Loop – Service change

    Maersk announce that effective 4 February 2012, they will be calling Jakarta, Indonesia....
  1. EXS (Exit Summary Declaration) Regulation
  2. 1 We would like to inform you that from 1st January 2012, EXS(Exit Summary Declaration) of EU 24Hour Rules will be applied for cargo which will be brought out of the EU but for which export customs decl....
  3. IMDG Code rule change
  4. 2 Valued customers,

    We would like to inform you regarding an IMDG Code rule change that will become effective 1 January 2012, which will impact any motor vehicles or machinery powered by combusti....
  1. Russia was admitted to the WTO
  2. 1  December 16 WTO Ministerial Conference in Geneva adopted the terms of Russia's entry into the organization.  Protocol of Accession signed by WTO Director General Pascal Lamy and Minister of....
 
 
 
 
 
 Mission and Vision
 
  Container Specification
 
Port of Colombo, Sri Lanka
 
Longitude 79’ 51’E
Latitude 06’ 57’N
UN/LOCODE LKCMB
Web www.slpa.lk
Address No. 19, Chaithya Road,  Colombo 01 , P. O. Box 595.
Tel. + 94 11 2421201
E-mail webmaster@slpa.lk

Deviation time

From main east –west route *1 ½ hours (approx)

Port Dimension

Harbour area at low water 195 hectares
Length of South-West break water 1531 meters
Length of North-West break water 810 meters
Length of North-East break water 330 meters
Western entrance 235m X 16m
Northern entrance 190m X 13m

Berthing Facilities

Total number of alongside berths : 25

Pier (s)

Total length (M)

Alongside Draft (m)

Jaya Container Terminal
1292+350
*12.00-15.00
Unity Container Terminal
590
9.00-11.00
South Asia Gateway Terminal
940
*15
Bandaranaike Berths
920
7.00-9.5
Coaster Berths
185
4.60-6.1
Prince Vijaya Quay
330
9.10-9.45
New North Pier
240
10.3
South Pier
252
9.15
Guide Pier
365
9.15
Passenger Jetty
180
9.5


Container Handling Facility

Jaya Container terminal (JCT)
  • 4 Container berths + 2 Feeder berths
  • 1,292m Quay wall + 350m of Feeder berth Quay wall
  • 12.0m to 15m of dredged depth
  • 14 Quayside Container Cranes (Panamax and Super Post Panamax)
  • 39 Nos Rubber-tyred container transfer cranes (RTG)
  •  04 Rail mounted gantry cranes to stack empty containers 8 high (RMG)
  • 160 Terminal tractors and trailers
  • 45.5 Hectares of container terminal area
  • 44,120 TEU Dry container stacking capacity
  • 1548 TEU Reefer container stacking capacity
  • 32,310 Sq.m. of container freight station area
  • Ship planning system with Electronic Bay Plan transfers in UNEDIFACT format
  • Direct Link computer facilities to the terminal users (EDI)
  • Real time computer system for yard planning and yard operations
  • Web based terminal information system
 
Unity Container terminal (UCT)
  • 2 Container berths
  •  1 Multipurpose berth
  • 590m of main quay wall
  • 9.00-11.00 m of dredged depth
  • 3 Nos Quayside container cranes
  • 8 Nos RTG
  • 45 Units of Terminal tractors
  • 1.53 Hectares of container terminal area
  • 8000 TEU Stacking capacity
  • Inter terminal road link with JCT and SAGT
 
South Asia Gateway Terminal (SAGT)
  • Total alongside berths 03
  • 3 Container berths
  • 940m of main quay wall
  • 15m of dredged depth(alongside)
  • 14 hectares of terminal area
 

Stacking Capasity

Type

No. of Slots

Stacking Height

capacity (TEU)

JCT

Dry Containers
JCT 1 (RTG)
1,980
One Over Three
7,920
JCT 2 (RTG)
2,184
One Over Three
8,736
JCT 3 (RTG)
2,376
One Over Four
11,880
JCT 4 (RTG)
1,560
One Over Four
7,800
Empty stacks (RMG)
814
One Over Seven
6,512
Top Lfters
318
One Over Three
1,272
Total Dry Container capacity
9,232
44,120
Reefer Containers  
JCT 1
72
One Over One
144
JCT 2
72
One Over One
144
JCT 3
108
One Over Two
324
JCT 4
312
One Over Two
936
 
564
1,548

UCT

Dry Containers
5,544
5
27,720
Reefer Containers
540
3
540